[1] Arafa M, Alqedra M. Early stage cost estimation of buildings construction projects using artificial neural networks. J Artif Intell 2011;4:63–75.
[2] Petroutsatou K, Georgopoulos E, Lambropoulos S, Pantouvakis JP. Early Cost Estimating of Road Tunnel Construction Using Neural Networks. J Constr Eng Manag 2012;138:679–87. doi:10.1061/(ASCE)CO.1943-7862.0000479.
[3] Yeh I-C. Quantity Estimating of Building with Logarithm-Neuron Networks. J Constr Eng Manag 1998;124:374–80. doi:10.1061/(ASCE)0733-9364(1998)124:5(374).
[4] Hegazy T, Ayed A. Neural Network Model for Parametric Cost Estimation of Highway Projects. J Constr Eng Manag 1998;124:210–8. doi:10.1061/(ASCE)0733-9364(1998)124:3(210).
[5] Cheng M-Y, Tsai H-C, Sudjono E. Conceptual cost estimates using evolutionary fuzzy hybrid neural network for projects in construction industry. Expert Syst Appl 2010;37:4224–31. doi:10.1016/j.eswa.2009.11.080.
[6] Hyari KH, Al-Daraiseh A, El-Mashaleh M. Conceptual Cost Estimation Model for Engineering Services in Public Construction Projects. J Manag Eng 2016;32:04015021. doi:10.1061/(ASCE)ME.1943-5479.0000381.
[7] Murat Günaydın H, Zeynep Doğan S. A neural network approach for early cost estimation of structural systems of buildings. Int J Proj Manag 2004;22:595–602. doi:10.1016/j.ijproman.2004.04.002.
[8] Doğan SZ, Arditi D, Murat Günaydin H. Using Decision Trees for Determining Attribute Weights in a Case-Based Model of Early Cost Prediction. J Constr Eng Manag 2008;134:146–52. doi:10.1061/(ASCE)0733-9364(2008)134:2(146).
[9] Adeli H, Wu M. Regularization Neural Network for Construction Cost Estimation. J Constr Eng Manag 1998;124:18–24. doi:10.1061/(ASCE)0733-9364(1998)124:1(18).
[10] SMITH AE, MASON AK. COST ESTIMATION PREDICTIVE MODELING: REGRESSION VERSUS NEURAL NETWORK. Eng Econ 1997;42:137–61. doi:10.1080/00137919708903174.
[11] Attalla M, Hegazy T. Predicting Cost Deviation in Reconstruction Projects: Artificial Neural Networks versus Regression. J Constr Eng Manag 2003;129:405–11. doi:10.1061/(ASCE)0733-9364(2003)129:4(405).
[12] Kim G-H, An S-H, Kang K-I. Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning. Build Environ 2004;39:1235–42. doi:10.1016/j.buildenv.2004.02.013.
[13] Liu J-G, Zhang X-L, Wu W-P. Application of Fuzzy Neural Network for Real Estate Prediction, 2006, p. 1187–91. doi:10.1007/11760191_173.
[14] Lowe DJ, Emsley MW, Harding A. Predicting Construction Cost Using Multiple Regression Techniques. J Constr Eng Manag 2006;132:750–8. doi:10.1061/(ASCE)0733-9364(2006)132:7(750).
[15] Shehab T, Farooq M, Sandhu S, Nguyen T-H, Nasr E. Cost Estimating Models for Utility Rehabilitation Projects: Neural Networks versus Regression. J Pipeline Syst Eng Pract 2010;1:104–10. doi:10.1061/(ASCE)PS.1949-1204.0000058.
[16] Wang Y-R, Yu C-Y, Chan H-H. Predicting construction cost and schedule success using artificial neural networks ensemble and support vector machines classification models. Int J Proj Manag 2012;30:470–8. doi:10.1016/j.ijproman.2011.09.002.
[17] Naik MG, Kumar DR. Construction Project Cost and Duration Optimization Using Artificial Neural Network. AEI 2015, Reston, VA: American Society of Civil Engineers; 2015, p. 433–44. doi:10.1061/9780784479070.038.
[18] Gardner BJ, Gransberg DD, Rueda JA. Stochastic Conceptual Cost Estimating of Highway Projects to Communicate Uncertainty Using Bootstrap Sampling. ASCE-ASME J Risk Uncertain Eng Syst Part A Civ Eng 2017;3:05016002. doi:10.1061/AJRUA6.0000895.
[19] Beale MH, Hagan MT, Demuth HB. Neural network toolbox user’s guide. MathWorks Inc 1992.
[20] MacKay DJC. Bayesian Interpolation. Neural Comput 1992;4:415–47. doi:10.1162/neco.1992.4.3.415.
[21] Patel DA, Jha KN. Neural Network Model for the Prediction of Safe Work Behavior in Construction Projects. J Constr Eng Manag 2015;141:04014066. doi:10.1061/(ASCE)CO.1943-7862.0000922.